 |
YP 2805's boiler's blowdown valve being opened. The boiler is thus cleaned
of sludge and sediments by venting under steam pressure. |
 |
Driver Govind Ghadavi watches his loco being prepared for the 1815 hrs.
departure. |
 |
The shed and driving staff in and atop the YP's cab. |
 |
Same friendly gang with their loco while the boiler is being blown down in
the background. |