Morning at WKR Jn.
 |
This is the YP 2805 shunting to isolate one coach and coupling to the
three coaches that forms the 416 down fast passenger to Morbi. |
 |
Those who notice the photographer's shadow (mine !) on the ground will
also see the shadow of the 416 down rake. The loco moves back after leaving the cut off
coach on another line. |
 |
One more shot of the loco. |
 |
YP 2805 shows off its linkage after coupling. Wankaner has only one
platform line which was being cleared when the shunting pushed the rake to the middle
line. Hence the train departed from a non platform line. |
 |
The coupling of a loco is the one event that many non railfans always
watch with great interest. |